Release Notes - v0.65.1
このコンテンツはまだ日本語に翻訳されていません。
v0.65.1 (July 16, 2026)
Section titled “v0.65.1 (July 16, 2026)”Title: Restore Leios committee formation and keep relay recovery stable
Date: July 16, 2026
Version: v0.65.1
This release restores committee formation on supported Leios deployments when required committee settings are missing, keeps relay discovery and rollback recovery more reliable, and strengthens transaction submission and release validation checks.
Recommended Network Compatibility ⚠️
Section titled “Recommended Network Compatibility ⚠️”| Network | Compatible |
|---|---|
| mainnet | ⛔ |
| preprod-testnet | ⛔ |
| preview-testnet | ✅ |
✨ Highlights
Section titled “✨ Highlights”-
Restored committee formation on Musashi and other Dijkstra based Leios networks when required committee settings are missing, so certification can continue without changing a pinned network configuration while still rejecting invalid settings.
-
Hardened transaction submission so unexpected data fails safely instead of interrupting request processing.
-
Corrected single relay chain sync recovery so rollback processing can move forward instead of repeating the same loop.
-
Stabilized pool relay connections so Dingo uses the resolved network address when a discovered relay name does not connect cleanly during connection setup.
-
Strengthened resilience test image builds so automated validation uses the intended container setup before release verification runs.
-
Expanded reward data validation so automated checks keep reward behavior aligned across supported data stores.
Full Changelog: v0.65.0…v0.65.1